Hebel Panel Installation

At Hebel Panel Installation: Wall Floor and Fence powered by Masterwall NSW, we provide professional installers to make your construction seamless.

Hebel Installation and Hebel Block Installation

Hebel installation is a swift and efficient process, contributing to our sublime services and the popularity of these autoclaved aerated concrete panels in construction. These specialized services ensure efficient handling, precise placement, and timely completion. Professional installers leverage the lightweight and versatile nature of Hebel panels, optimizing their thermal insulation and acoustic properties.

Hebel block installation is a crucial phase in construction, leveraging the unique properties of autoclaved aerated concrete. These blocks, composed of sand, cement, lime, and aluminum powder, are renowned for their lightweight nature, facilitating ease of handling during installation.

Professional installers at Hebel Panel Installation – Wall Floor and Fence meticulously place and secure Hebel blocks, ensuring precision in creating walls that offer excellent thermal insulation and acoustic performance.

Hebel Panel Installation

Hebel panel installation is a comprehensive process that involves several key steps to ensure a secure, durable, and aesthetically pleasing result. The following detailed guide outlines the typical installation steps for Hebel panels:

Foundation Preparation

Begin by ensuring the foundation is level, clean, and free from any debris. Apply a suitable adhesive or mortar to secure the panels to the foundation securely.

Panel Layout and Cutting

Plan the layout of Hebel panels, considering openings for doors and windows. Cut panels as needed for a precise fit using appropriate tools.

Adhesive Application

Apply a thin layer of specialized Hebel adhesive or thin-set mortar on the edges and surfaces of the panels to facilitate a strong bond.

Panel Placement

Lift and carefully position Hebel panels onto the prepared foundation, aligning them according to the layout plan. Press the panels firmly into the adhesive to ensure proper adhesion.

Securing Panels

Temporarily secure the panels in place using braces or clamps until the adhesive sets, ensuring stability during the curing process.

Joint Treatment

Apply a Hebel jointing compound or specialized adhesive to fill and seal panel joints, creating a smooth and cohesive surface.

Reinforcement Installation

Install any required reinforcement, such as steel mesh or reinforcing bars, following the design specifications to enhance structural integrity.

Finishing Touches

Cut and shape panels for corners, edges, and openings to achieve a precise fit.

Get In Touch With Us

For more information or to schedule an installation,
please get in touch at 02 9058 2999